Report · Legalisation

Report on a completed redevelopment of premises

Legalising an already completed redevelopment of commercial premises — an official report on its admissibility and safety.

  • from 200,000 KZT
  • 1–6 weeks
  • 300+ projects across Kazakhstan
  • accepted by GASK, the akimat and state expert review

When a report is needed

When a redevelopment of commercial premises has already been carried out, a building condition report is required to legalise it. The report confirms that the changes made have not reduced the load-bearing capacity of the building.

KAZNICEP LLP inspects the premises as built and issues a report to legalise the redevelopment.

Our portfolio includes reports on completed redevelopments of buildings and premises (Kazgiprovodkhoz Institute Production Cooperative, 187A Suyunbay Ave.).

02 / What the work includes
1.0

Inspection of the completed redevelopment of the premises.

2.0

Comparison with the original layout and the codes.

3.0

Assessment of the impact of the changes on the building structures.

4.0

A report on the admissibility of the completed redevelopment.

Frequently asked questions

How much does a technical building inspection cost?

The cost starts from 200,000 KZT and depends on the property: floor area, number of storeys, structural scheme, condition of the structures and scope of work. We give an exact price after clarifying the input data for the property.

How long does the inspection and the issue of the report take?

From 1 to 6 weeks. The timeline depends on the area and complexity of the property, the volume of instrumental work and the need for verification calculations.

Is your report suitable for GASK, the akimat and state expert review?

Yes. The engineering report is prepared in accordance with the building codes of the Republic of Kazakhstan and is used for approvals with the authorised bodies and when passing state expert review.

How long is the engineering report valid?

As a rule, 3 years — provided the condition of the property, the loads and the operating conditions have not changed. If new defects appear or loads increase, a repeat inspection is required.

Do you travel around Almaty and the region?

Yes, we travel around Almaty and the Almaty Region. Large properties — administrative, industrial and public buildings — we inspect across Kazakhstan.

What do you need to get started?

Just describe the property: address, building type and task (redevelopment, reconstruction, condition assessment). If you have a technical passport or design documentation, attach it — this speeds up the work.

What should I do if the redevelopment of commercial premises is already done?

You need a building condition report confirming that the changes made have not reduced the load-bearing capacity of the building. It is used to legalise the redevelopment.

03 / Core service

Technical
inspection of buildings

Legalising a redevelopment is carried out on the basis of a technical inspection.

About the service Contact us