Technical inspection & engineering reports
One discipline — dozens of specific tasks. Below are the types of engineering reports we prepare for organisations and business properties.
Technical inspection of buildings and structures
KAZNICEP LLP specialises in the technical inspection of buildings and structures and issues official engineering reports for properties of responsibility levels I and II. On the basis of the report, decisions are made on redevelopment, repair, reconstruction, extensions or demolition.
We work with the properties of organisations of any scale — administrative, retail, industrial and public buildings, schools and hospitals — across Kazakhstan. We do not inspect private houses or apartments and do not perform assessments for court disputes.
Services for business
A report on the technical condition of a building for organisations.
0.02 Feasibility of redeveloping commercial premisesFor shops, offices, cafés and other premises.
0.03 Completed redevelopment of commercial premisesLegalising an already completed redevelopment of commercial premises.
0.04 Reconstruction and major repairInspection before reconstruction and major repair.
0.05 Pre-design stage (survey for design documentation)A survey of an existing building as the basis for design.
0.06 Adding an extension to a buildingA report on adding an extension to an existing building.
0.07 Adding floorsFeasibility of adding one or more floors above a building.
0.08 Load-bearing walls, cracks, strengtheningAssessment of load-bearing structures and strengthening recommendations.
0.09 Change of land designated useTechnical support for changing the designated use of a land plot.
0.10 Seismic assessment of a buildingInspection and calculation for seismic loads for properties.
0.11 Post-construction inspectionCompliance with the design and acceptance of a completed property.
0.12 Inspection before major repairCondition assessment as the basis for a major-repair design.
0.13 Legalisation of unauthorised constructionA report to legalise buildings erected without permits.
0.14 Redevelopment of premises — general caseMerging units, moving partitions, changing the use of premises.
Didn't find the
report you need?
Describe your task — we will tell you exactly which engineering report your property needs.
Contact us